The project description
June 2026
Rubber Wet Pour Surfacing, Rubber Mulch and Decorative Landscape Finishes
Lightweight Construction, Durable Surfaces, Enhanced Resident Experience, Low Maintenance, Phased Delivery, Podium Deck Expertise
Working collaboratively with the client, Ace Resin supplied and installed a range of surfacing solutions designed to define different recreational and landscaped areas throughout the development.
Rubber Wet Pour Surfacing
The children’s play areas were finished using a beige rubber wet pour system. The lighter colour palette was chosen to brighten the environment and create a welcoming contrast against the darker grey tones used throughout the walkways and circulation routes.
The seamless finish provides a safe, durable, and low-maintenance play surface while helping to soften the urban environment.
Rubber Mulch Surfacing
Selected landscaped areas were finished with rubber mulch, creating the appearance of natural bark while offering significant practical advantages.
Rubber mulch is particularly well suited to podium deck applications because it is lightweight, permeable, durable, and requires minimal maintenance. Unlike natural bark, it does not decompose, blow away easily, or require regular replenishment, making it an ideal long-term solution for high-traffic communal areas.
The natural appearance helped create softer, greener spaces while maintaining the practical performance required within a residential development.
Walkways and Recreational Areas
The contrasting darker grey surfacing used throughout the walkways helped define circulation routes while creating visual interest and clear separation between different functional zones.
The result is a landscape scheme that feels cohesive, modern, and inviting.
Collaboration and Delivery
One of the keys to the project’s success was the close collaboration between Ace Resin and the client team.
As a trusted delivery partner, we worked proactively to coordinate installation phases around the wider construction programme, ensuring each area was completed and handed over in line with the client’s strict timetable.
Because Ace Resin uses its own directly employed installation teams rather than subcontract labour, we maintain complete control over quality, scheduling, and site coordination. This flexibility allowed us to respond quickly to changing site conditions and programme requirements while maintaining consistently high standards throughout the project.



Tomorrow is the most important thing in life comes into us at midnight very clean. It's perfect when it arrives and it puts it self in our hands.